Re-engineering the line…
Loading Nigeria
elevation data
Abuja → Lagos · concept

Hyperspeed Rail

The numbers
Draw your own line

Drag the points to reshape the line; stations snap onto it. Double-click the map, or use Add point, to add a bend. Right-drag to move the map.

Engineering, timetable and cost are recomputed for every change. Detailed terrain and buildings cover the original corridor only.
Make a film

A 36-second flyover of the line: departure, the tallest viaduct, the Niger, the cab at full speed, the longest tunnel and arrival, with captions. It uses the current light, technology and line.

Stop 1 of 10

0km/h
NowAbuja Central
NextLagos Marina
Elapsed0:00
Arrive0:00
Guideway0 m
Lateral0.00 g
At grade